Solution Brief – Acuren Partners with An Energy Leader to Provide Access Solutions
Problem Acuren has partnered with an energy company to support their TA/Maintenance program in Fort McMurray, Canada Launched in the fall 2016, an access planner works with planning and execution teams at site to drive new access methods to reduce cost and time for outage scopes. At times, teams have been made of up to […]
Underside of Bridge Emergency Water Main Repair
There are two 30 inch diameter ¼” wall thickness steel water mains, which run along the underside of the bridge over a river way, that provide major water distribution to the community. The mains were installed in 1961 and suffered leakage at support guide attachments due to external corrosion. The leak locations were difficult to […]
Flare Stack – Extending Operating Life of Critical Legacy Asset
Integration across Acuren service lines achieves cost-effective and timely asset life extension This oil and gas customer had a 60-year-old flare stack with cracking and corrosion that was approaching its end of life. Due to the cracking and corrosion thinning, there was considerable potential for failure for the flare tip and stack pipe. The cost […]
Integrated Solutions
Acuren Safely Completed a Flare Tip Replacement & Coatings Project in Ohio The four-week project incorporated Acuren’s Mechanical, Engineering, and Rope Access Industrial Services to replace an existing flare tip at a refinery, including weld repairs and coatings. The project utilized rope access to remove the existing flare tip and install a new one, weld […]
Rope Access Turns “No Way” Into Project Success
The project plan was to weld multiple sheets of AR 400 wear plate together on the ground to form a 13-meter by 3-meter pie-shaped plate and lift it in position as a whole. The plate was then welded into position following welding procedures and an inspection and test plan developed in-house by Acuren engineers. The […]
Ropes Team Saves Thousands on Pump Box Work
Summary During a planned outage ultrasonic testing and visual inspection revealed that a significant portion of the pump box floor either needed to be repaired, or cut out and replaced. As well, 16 spray nozzles needed to be replaced. Because of the difficult access area, a ropes solution was proposed. The Challenge Historically, while work […]