Ropes Team Saves Thousands on Pump Box Work
Summary During a planned outage ultrasonic testing and visual inspection revealed that a significant portion of the pump box floor either needed to be repaired, or cut out and replaced. As well, 16 spray nozzles needed to be replaced. Because of the difficult access area, a ropes solution was proposed. The Challenge Historically, while work […]
Monthly Maintenance Contract Pays Dividends
Summary Irving Wallboard is a highly automated, 300,000 square foot manufacturing facility that provides a broad range of gypsum wallboard products for use in the construction industry. This Saint John facility is one of the newest and most modern wallboard manufacturing facilities in North America. Acuren provides monthly Condition Based Monitoring services, whereby CBM Specialists […]