D'Andre Davis-Taylor

Insights by D'Andre:

Getting Good at Construction, Repair, and Maintenance in Winter

Implementation of a Closed System Mitigates the Possibility of an Emergency Event While Also Solving an Odor Issue

To resolve odor issues and mitigate brine system over-pressure risks, Acuren engineered a comprehensive closed-system solution for an LPG storage facility. The design featured a brine pressure vessel, flare stack, nitrogen gas system, and advanced safety controls. Completed on schedule despite logistical challenges, the system now ensures odor elimination and safe handling of potential emergencies.

How to Manage Fugitive Emissions by Reducing Potential Leak Points

Skip to content