- About
- About Overview
- Vision & Values
- Leadership Teams
- Corporate
- Canadian Operations
- United States Operations
- Service Line
- Safety
- Quality
- Environment
- Sustainability
- Indigenous Policy
- Hellier Training
- Applied Inspection
- Engineering
- Engineering Overview
- Field Engineering
- Field Engineering Overview
- Ferrite Testing
- Hardness Testing
- Metallurgical Replicas
- Optical Emission Spectroscopy (OES)
- Positive Material Identification (PMI)
- Materials Testing & Analysis
- Materials Engineering
- Metallurgical Condition Assessment
- Steam Cycle Chemistry Services
- STRAP – Steam Turbine Risk Assessment Program
- Support for Industrial Insurers and Independent Adjusters
- Water Treatment Technologies Services
- Reliability Engineering
- Vibration Analysis
- Inspection
- Inspection Overview
- Advanced NDE/NDT
- Moisture Detection Imaging (MDI)
- Non-Intrusive/On Stream Inspection Program
- Phased Array Services
- Time of Flight Diffraction Technique (ToFD)
- Tube to Tube Sheet Weld Inspection
- NDE/NDT
- Visual Inspection (VT)
- National Board Program
- Drone & Robotic Inspection Services
- Lab Services – Inspection & NDT
- Rope Access for Inspection
- Inspection Training
- Rope Access Industrial Services
- Solutions
- Access Planner
- Ammonia Systems Inspection Services
- Asset Integrity Management / Mechanical Integrity
- Cathodic Protection Services
- Corrosion Under Insulation
- Drone & Robotic Inspection Services
- Facilities Piping Management Programs
- High Energy Piping Programs & Solutions
- Hydrogen Industry
- Laboratory Services – Inspection and NDT
- Laboratory Services – Materials Testing & Analysis
- Midstream Integrated Integrity Solutions
- National Board Program
- Non-Intrusive/On Stream Inspection Program
- PHMSA Mega Rule Solutions
- Research and Application Development
- Rope Access for CUPS
- Industries
- Industries Overview
- Aerospace
- Automobile
- Building & Infrastructure
- Chemical
- Food and Beverage
- Insurance & Litigation
- Manufacturing
- Metal Fabrication
- Mining
- Nuclear Power
- Oil & Gas
- Pipeline
- Pipeline Integrity Engineering Services
- Pipeline Integrity Field Services
- Power Generation
- Pulp & Paper
- Rail
- Tanks
- Wind
- Finish installing block perlite insulation at the 9 stiffner rings and top head
- Install jacketing and seal
- Install block perlite insulation around pipe supports and decking supports. Approximately 25 areas at 2’x2’ each. Insulation and jacketing provided by client and staged at base of tower.
- Install second layer of perlite insulation (2 layers on the ring that had none)
- Install and seal stainless steel corrugated jacketing over ring
- Install second layer of insulation
- Install and seal stainless steel corrugated jacketing over top head
- Install two layers of perlite insulation at each area
- Install and seal stainless steel corrugated jacketing over each area
- Ensure insulation was installed correctly with two layers
- Ensure areas have properly installed jacketing and sealed
- IRATA/SPRAT Level 1’s, 2’s and 3’s
- NCCER qualified insulators
Home Success Stories Unparalleled Execution In The Rope Access Light Mechanical SpaceUnparalleled Execution In The Rope Access Light Mechanical Space
Our client, a chemical plant located in east Texas was struggling to have a particular rope access scope of work completed by another provider. When it became clear that progress was falling further behind schedule, and the provider requested more money and time to complete, the client decided to terminate that arrangement. Acuren’s competitive bid was selected to finish the remaining work which included installation of insulation/jacketing on head of vessel, 9 rings, transition and 19 pipe support areas on a 230’ tower utilizing rope access.
SOLUTION / EXECUTION With over 700 rope access technicians across North America, Acuren was able to mobilize a crew quickly and execute the work flawlessly with zero safety incidents. The quoted project duration was expected to last four weeks (25 days). Actual completion was earlier than predicted and finished at 24 days which thrilled the client. The high expectations of the client were exceeded by the Acuren team’s work ethic, professionalism and “can-do” attitude. Acuren approached this work with a 7 man crew to complete the following:
With a network of over 700 rope access technicians, and precision in crew selection, combined with exceptional estimating practices, Acuren’s ability to execute high quality work, under budget is unparalleled in the rope access light mechanical space.
Install insulation at nine stiffener rings
8 rings currently had one layer of perlite insulation, 1 ring had noneTop Head
Top Head currently had one layer of perlite insulationPipe Supports and Deck Supports
Approximately 20 support areasNew Repair Areas
Areas around stiffener rings at decking had newly installed insulation and jacketingCrew Mix
(1) Project Manager LIII Rope Access
(1) Level III Rope Access Supervisor(s)
(3-4) NCCER Insulator(s)
(1-3) Insulation Helper(s)Trades
WHY ACUREN? Acuren delivered and exceeded expectations. Acuren was awarded this work based on a competitive bid process and executed in ways the competition could not, without sacrificing safety, quality or productivity. Under budget and under schedule results from years of experience in planning and executing similar work. This affords Acuren a level of precision in crew member selection and project estimating that is unparalleled in the rope access light mechanical space.
![Cleantalk Pixel Cleantalk Pixel](https://moderate1-v4.cleantalk.org/pixel/6709032366a0d0f547e11a04d3c3ada1.gif)